6TH OF OCTOBER TUNNEL JACKING
Rowad has been awarded the 6th of October Tunnel project. A project that is very detailed as it entails “the pushing process” method in order to place the tunnel under the railway. Rowad started off by building two concrete canals of 6 m height, 30 m length, and 12 m width.