GOV 2 INFRASTRUCTURE
Rowad executed the full engineering, supply, installation, testing, commissioning, and guarantee of infrastructure networks for Governmental District No. 2 (GOV 2) in the New Administrative Capital, covering 1,400 acres. The scope included 34.7 km of UPVC/HDPE water and fire pipelines with 310 hydrants, 29.9 km of irrigation pipelines, and 38.6 km of sewage and stormwater pipelines with 829 manholes.
