NEW CAIRO CAPITAL MOHAMED BEN ZAYED BRIDGE
MOHAMED BEN ZAYED
Rowad was selected to execute the construction works for a bridge measuring 160 meters in length, 75 meters in width, and up to 6 meters in height. Designed as a two-way road for vehicular traffic, the project scope includes earthworks such as excavation, soil replacement, and backfilling; concrete works including piles, footings, columns, walls, frames, precast post-tension beams, and slabs; as well as insulation, bearings, expansion joints, and all finishing works.