MAHALA BRIDGE
Project Description
The Egyptian Armed Forces chose Rowad to carry out the construction of El Shun Bridge in Mahala. The bridge, a total of 950 M long and 12 M wide, was completed in a period of just six months.
The Egyptian Armed Forces chose Rowad to carry out the construction of El Shun Bridge in Mahala. The bridge, a total of 950 M long and 12 M wide, was completed in a period of just six months.