30th OF JUNE TUNNEL
Rowad was selected to deliver the 30th of June Tunnel project in Ain El Sokhna for the Egyptian Armed Forces, under the supervision of the Egyptian Armed Forces Engineering Authority. The works include the construction of two tunnels: the first measuring 68 meters in length and 47 meters in width, and the second spanning 90 meters in length and 20 meters in width. The project scope covers extensive earthworks including excavation, soil replacement, and backfilling, in addition to cast-in-situ concrete works, ensuring structural durability and reliable performance for this critical infrastructure development.