EXPANSION DU PORT DE SOKHNA, PIER 4
Rowad is responsible for the execution of the Sokhna Port Pier 4 basins’ quays (2&4) and (3&5), with a length of 675 m initially. The project has been extended for another 100 m for quay 4, with a depth of 31.1 m and piles of length 36.1 m with a diameter of 1.2 m.